Dark asphalt surface texture
Paving & Asphalt · Burnaby, BC

WE PAVE
BURNABY
LOT BY LOT.

Driveways, parking lots, repairs and line painting — graded to drain, based to carry the load, and rolled to hold through every wet Burnaby winter. This is an unsolicited concept site from X9 Lab Media; the photos are royalty-free stock, to be swapped for the crew's own.

DrivewaysParking lotsRepairsSealingLine painting

WHAT WE LAY.

New surfaces, repairs and the maintenance that keeps them alive. Every job in Burnaby and the Lower Mainland.

Smooth asphalt driveway surface
01

Driveways

New, replacement and widened driveways — graded, edged and rolled smooth.

Asphalt parking surface with arrows
02

Parking lots

Commercial lot paving, overlays and crisp line painting for stalls and lanes.

Cracked asphalt before repair
03

Repairs & patching

Potholes, patches, edge fixes and overlays — before small cracks become big ones.

Sealed wet asphalt
04

Crack-fill & seal

Sealing locks water out of the cracks where freeze-thaw does the damage.

Fresh line paint on asphalt
05

Line painting

Stalls, arrows and curb markings — the detail that makes a lot read as cared-for.

Yellow roller compacting
06

Grading & compaction

Sub-grade prep and base compaction — the foundation every lasting surface needs.

BUILT ON THE BASE.

Anyone can spread hot mix. What makes a driveway or a lot last is the part nobody sees once it's paved — the grade that drains the water, the compacted base that carries the load, and the rolling that locks it all tight before it cools.

That's where Burnaby Blacktop puts the work: in the foundation. Residential driveways, commercial lots, patch-and-overlay and crack-and-seal — done so they hold through the wettest winters in the country.

Straight scope, clean edges, a surface graded to shed our rain. No shortcuts on the part you can't see.

Compacted asphalt surface aggregate close-up
Compacted hot-mix surface, up close — stock placeholder.

THE ORDER OF WORK.

Same sequence, every job — because the steps you skip are the ones that fail first.

01

Grade & drainage

Set the slope so rain runs to the edge and away from the structure. The first and most important decision.

02

Compacted base

Crushed-stone base built and compacted in lifts — the load-bearing layer under everything.

03

Pave in courses

Coarse binder for strength, fine surface course for the finish you drive and park on.

04

Roll hot

Compact the surface while it's hot to lock the aggregate tight and make it watertight.

05

Seal & line

Clean edges, seal the cracks, paint crisp lines. The finishing pass that makes it last and look it.

GET A
QUOTE.

Tell us what you're paving in Burnaby. We'll walk the site, talk scope, and give you a straight number.

ADD THE SHOP'S #
Hours & service area
  • Mon – Fri 7:00a – 5:00p
  • Saturday By appointment
  • Sunday Closed
  • Service area Burnaby & Lower Mainland
Call for a free quote

Concept layout from X9 Lab Media. The phone link, email and quote form go live once the owner confirms their real contact details — nothing here is a real published number, and no ratings, reviews, prices or addresses have been invented.